Sunday, 28 February 2010

Bridge 20 progress 28.2.10

This is a bit of a worry - new brickwork on a damaged pillar
Slow progress with the bricklaying on the parapet

The Willington side has been pointed
Slow progress on the left parapet (Stenson side) the bridge saddle has been concreted

Update on the bridge 20 repairs as at 28.2.10.
This work should be completed and the canal opened by 13.3.10 - doesn't look good and difficult to see where the £250k has gone (probably mostly health and safety and worker comforts)

The bridge pillar on the damaged side has not been repaired at the base - surely this will eventually crack and collapse.
The bricklaying is very slow - probably due to a lack of qualified staff and the lime mortar problems.