The other stoppage on the T & M that has brought the canal to a stand still for the early part of 2010.
A repair not as sexy as the one at bridge 20 but just as disruptive
As usual the contractors have gone a bit employee welfare and H & S mental. There are at least 3 site cabins, 24hr high viz man attendance and a bespoke canal crossing which isnt actually needed as the parapets are only being pointed and the bridge is safe for walkers/joggers/cyclists.
A repair not as sexy as the one at bridge 20 but just as disruptive
As usual the contractors have gone a bit employee welfare and H & S mental. There are at least 3 site cabins, 24hr high viz man attendance and a bespoke canal crossing which isnt actually needed as the parapets are only being pointed and the bridge is safe for walkers/joggers/cyclists.
I notice that the sign states that the bridge will be open early if the work is completed early!
It doesn't look as if the towpath collapse complete with the obligatory orange tape is part of this maintenance operation.